Mr. Derby whats the scoop?
Water lines have been repaired and replaced by Akron city water dept.. Track has been repaired and re-surfaced in damaged areas by city road crew. Awaiting city sewer dept. to clean drains. Starting plates to be lifted Thur. or Fri. to clean out sand washed into them, bearings on shaft will then need to be checked and lubed, hopefully when that done, everything will be good to go. BHH